Techno Economic Feasibility Report for setting up a 5000 KW Solar Photovoltaic Power Plant at Atharga in Bijapur district of Karnataka.

Techno Economic Feasibility Report for setting up a 5000 KW Solar Photovoltaic Power Plant at Atharga in Bijapur district of Karnataka.

The post has been moved to here – http://industrymonitor.in/energy/2011/03/capacity-allotment-solar-power-project-development-gujarat/
Scridb filterThe post has been moved here : http://industrymonitor.in/energy/2011/01/key-world-energy-statistics-2010/
Project at a Glance
a) Name of the Project : Pragati II Combined Cycle Power Project
b) Name of the Promoter : Pragati Power Corporation Limited, (Govt. of
Delhi)
c) Location : Bamnauli Village, Southwest of Delhi
d) End Product : Electricity
e) Capacity : 800 MW (Maximum capacity)
f) Man Power : Peak labour force – 1300 / Operation period – 480
g) Project Time Schedule : 28 months
h) Raw Materials and Utilities
- Natural Gas : 3.0 MSCMD (Million standard Cubic Meter
per day)
- Water (Treated Sewage) : 2000 m3/ hr
i) Mode of operation : Base load operation is envisaged
j) Project Cost : Rs. 3025 Crores (Approximately) including
land cost

Download – THE PROPOSED 800 MW PRAGATI-II GAS BASED
COMBINED CYCLE POWER PROJECT AT BAMNAULI – Rapid EIA Report
Status of Solar Thermal Technologies and Markets in India and Europe – An OPET international action “Enhancement Of Market Penetration Of Solar Thermal Technologies”

Prepared by
OPET-TERI
Tata Energy Research
Institute
Darbari Seth Block
Habitat Place, Lodi Road
New Delhi – 110 003
India
http://www/teriin.org
Table of Contents :
CHAPTER 1 THE INDIAN SCENARIO 1
1.1 Introduction 1
1.1.1 Solar Collectors
1.1.1.1Flat Plate Collector 1
1.1.1.2Evacuated Tube Collector 2
1.2 Market 2
1.3 Policy And Promotional Measures 3
1.3.1 Subsidies 4
1.3.2 Fiscal Incentives 5
1.4 Solar Thermal Technologies In The Context Of
Clean Development Mechanism 5
1.4.1 Additionality 6
1.4.2 Baseline 6
1.4.3 Cost 6
1.4.4 Monitoring And Verification 7
CHAPTER 2 THE GREEK SCENARIO 8
2.1 The Greek Solar-Thermal Market 8
2.1.1 Technical Standards 8
2.1.2 Typical Solar Domestic Hot Water System 8
2.2. Policies For The Promotion Of Solar Thermal Technologies 8
2.2.1 Market Incentives 8
2.2.2 Promotional Actions And Programs 9
2.2.3 Fiscal Measures 9
2.2.4 Subsidies 10
2.2.5 Third-Party Financing Concept 11
CHAPTER 3 THE EUROPEAN SCENARIO 13
3.1 Introduction 13
3.2 The European Solar-Thermal Market 13
3.2.1 Technical Status And Applications 13
3.2.2 Current Market Situation And Future Prospects 14
3.2.4 Installation Costs 15
3.2.4 Market Development 15
3.3 European Policies For The Promotion Of Solar Thermal
Technologies 16
3.3.1 Experiences Of The Member States Regarding
Policy Measures And Strategies For The Promotion
Of Solar Thermal Technologies 16
3.3.2 Community Programs 18
3.3.3 Market Barriers And Success Factors 18
3.3.4 Competitiveness Of Eu-Manufacturers 19
3.3.5 The Campaign For Take-Off 20
References 21
Annexure I
M/s ABG Cement Ltd., A Division of ABG Shipyard Ltd., intends to set-up Clinker Grinding Unit of 6.0 MTPA at Surat in the 1st Phase and a 2X30 MW

Pet coke based Captive Thermal Power Plant with CFBC Boiler and Air cooled Condensers in the 2nd Phase. The present Pre-Feasibility report is based on the availability of 1.5 MTPA slag from M/s. Essar, Hazira, sufficient quantities of Fly Ash from Wanakbori and Ukai Thermal Power Plants of GEPCL and easy access to Indian and Overseas market by
economical sea route.