Industry Monitor Library

...repository of Industry related articles , reports, manuals, guidelines, data, statistics, presentations

Tarun Solar – Pre Feasibility Report

Written by admin on March 25th, 2011

Techno Economic Feasibility Report for setting up a 5000 KW Solar Photovoltaic Power Plant at Atharga in Bijapur district of Karnataka.

Download Report

Scridb filter

Capacity allotment for solar power project development in Gujarat

Written by admin on March 7th, 2011

The post has been moved to here – http://industrymonitor.in/energy/2011/03/capacity-allotment-solar-power-project-development-gujarat/

Scridb filter

Key World Energy Statistics 2010

Written by admin on March 6th, 2011

The post has been moved here : http://industrymonitor.in/energy/2011/01/key-world-energy-statistics-2010/


(Contains 1 attachments.)Scridb filter

Bamnauli Gas Based Power Project – EIA

Written by admin on December 8th, 2010

Project at a Glance
a) Name of the Project : Pragati II Combined Cycle Power Project
b) Name of the Promoter : Pragati Power Corporation Limited, (Govt. of
Delhi)
c) Location : Bamnauli Village, Southwest of Delhi
d) End Product : Electricity
e) Capacity : 800 MW (Maximum capacity)
f) Man Power : Peak labour force – 1300 / Operation period – 480
g) Project Time Schedule : 28 months
h) Raw Materials and Utilities
- Natural Gas : 3.0 MSCMD (Million standard Cubic Meter
per day)
- Water (Treated Sewage) : 2000 m3/ hr
i) Mode of operation : Base load operation is envisaged
j) Project Cost : Rs. 3025 Crores (Approximately) including
land cost

Download – THE PROPOSED 800 MW PRAGATI-II GAS BASED
COMBINED CYCLE POWER PROJECT AT BAMNAULI – Rapid EIA Report

Scridb filter

Status of Solar Thermal Technologies and Markets in India

Written by admin on November 10th, 2010

Status of Solar Thermal Technologies and Markets in India and Europe – An OPET international action “Enhancement Of Market Penetration Of Solar Thermal Technologies”

Prepared by

OPET-TERI
Tata Energy Research
Institute
Darbari Seth Block
Habitat Place, Lodi Road
New Delhi – 110 003
India

http://www/teriin.org

Table of Contents :

CHAPTER 1 THE INDIAN SCENARIO 1

1.1 Introduction 1
1.1.1 Solar Collectors
1.1.1.1Flat Plate Collector 1
1.1.1.2Evacuated Tube Collector 2
1.2 Market 2
1.3 Policy And Promotional Measures 3
1.3.1 Subsidies 4
1.3.2 Fiscal Incentives 5
1.4 Solar Thermal Technologies In The Context Of
Clean Development Mechanism 5
1.4.1 Additionality 6
1.4.2 Baseline 6
1.4.3 Cost 6
1.4.4 Monitoring And Verification 7

CHAPTER 2 THE GREEK SCENARIO 8

2.1 The Greek Solar-Thermal Market 8
2.1.1 Technical Standards 8
2.1.2 Typical Solar Domestic Hot Water System 8
2.2. Policies For The Promotion Of Solar Thermal Technologies 8
2.2.1 Market Incentives 8
2.2.2 Promotional Actions And Programs 9
2.2.3 Fiscal Measures 9
2.2.4 Subsidies 10
2.2.5 Third-Party Financing Concept 11

CHAPTER 3 THE EUROPEAN SCENARIO 13

3.1 Introduction 13
3.2 The European Solar-Thermal Market 13
3.2.1 Technical Status And Applications 13
3.2.2 Current Market Situation And Future Prospects 14
3.2.4 Installation Costs 15
3.2.4 Market Development 15
3.3 European Policies For The Promotion Of Solar Thermal
Technologies 16
3.3.1 Experiences Of The Member States Regarding
Policy Measures And Strategies For The Promotion
Of Solar Thermal Technologies 16
3.3.2 Community Programs 18
3.3.3 Market Barriers And Success Factors 18
3.3.4 Competitiveness Of Eu-Manufacturers 19
3.3.5 The Campaign For Take-Off 20

References 21
Annexure I

Download Solar Thermal Markets India

Scridb filter

ABG Cement – Greenfield Project – Pre-Feasibility Report

Written by admin on November 9th, 2010

M/s ABG Cement Ltd., A Division of ABG Shipyard Ltd., intends to set-up Clinker Grinding Unit of 6.0 MTPA at Surat in the 1st Phase and a 2X30 MW

Pet coke based Captive Thermal Power Plant with CFBC Boiler and Air cooled Condensers in the 2nd Phase. The present Pre-Feasibility report is based on the availability of 1.5 MTPA slag from M/s. Essar, Hazira, sufficient quantities of Fly Ash from Wanakbori and Ukai Thermal Power Plants of GEPCL and easy access to Indian and Overseas market by
economical sea route.

Download ABG Cement – Pre-Feasibility Report

Scridb filter