Chamera Hydro Electric Project Stage-III 231 MW

Location: HIMACHAL PR.

Capacity: [MW 231]

The project is a run-of-the river scheme on river Ravi in Chamba district of Himachal Pradesh. The project envisages construction of a 68 m high concrete gravity dam and an underground Power House on the right bank of the river. A gross head of 230 m is proposed to be utilized to generate 1108.17 Million Units (MU) in a 90% dependable year with an installed capacity of 3×77 MW.

Present Status: All major civil works were awarded to M/s HCC Ltd. by the contractor is currently in progress. Work on river diversion completed on 5.3.2007. HRT execavation completed. E&M works awarded to M/s Alstorm on 23.1.2007 is nearly completed. H&M work has been awarded to M/s Om Metal.

Status as on December 2009 : Design and drawing under finalisation, fabrication of pressure shaft liner under progress and erection work started and 100m erection work completed . EOT crane and draft tube have been reached at site. Erection, testing & commissioning of EOT completed on 23.08.08. The project is running smoothly as per the schedule.

List of New Thermal Power Projects in India- - Download Free Report

Related posts:

  1. Teesta Low Dam Hydro Electric Project Stage-IV 4×40 MW
  2. Teesta Low Dam Hydro Electric Project Stage-III 4×33 MW
  3. Parbati Hydro Electric Project Stage -III 4×130 MW
  4. Parbati Hydro Electric Project Stage-II 4×200 MW
  5. Nimoo Bazgo Hydro Electric Project, 3×15 MW
  6. Sewa-II Hydro Electric Project 3×40 MW
  7. Chutak Hydro Electric Project 4×11 MW, KARGIL
  8. Tehri Hydro Development Corporation Limited – Koteshwar Hydro Electric Project, 4×100 Mw