Satluj Jal Vidyut Nigam Limited – Rampur Hydro Electric Project 412 MW
Location: Rampur, HIMACHAL PR.
Capacity: [6 X 68.87 MW]
The project is located on river Satluj in Shimla and Kullu district of HP. The project envisage construction of
*A 15.08 m dia circular HRT terminating in surge shaft
*A 140 m high and 38 m dia surge shaft
*3 nos bifurcating into 6, partially underground penstocks, 5.40m/3.80m circular steel lined.
*Surface steel line
The project will provode 412 MW of peacking power to the northen grid and will generate 1770 Million units of electric energy in 90% dependable year.
Present status
Conc. Lining of diversion tunnel and exe. of Bael Adit with junction , Kazo adit, Goshai Adit with junction, pilot hole and drianage gallery of surge shaft, HRT Spill tunnel D/s, flood protection wall and erection of columns & beams in service bay I-II of power house completed upto June 09. Other activities are at different stages of implementation. The EM works was awarded to BHEL on Sept 08 with a execution period of 42 months.
Related posts:
- Parbati Hydro Electric Project Stage -III 4×130 MW
- Lower Subansiri Hydro Electric Project 8×250 MW
- Tehri Hydro Development Corporation Limited – Koteshwar Hydro Electric Project, 4×100 Mw
- Kishanganga Hydro Electric Project
- Parbati Hydro Electric Project Stage-II 4×200 MW
- North East Electric Power Corporation – Kameng Hydro Electric Project 4×150 Mw
- National Hydro-Electric Power Corporation – Loktak Downstream Hydro Electric Project 3×30/2×33 MW
- North East Electric Power Corporation – Tuirial Hydro Electric Project (2x30MW)