- a) Extending 400 kV D/c of original Vallur TPS transmission system from LILO point to Malekottaiyur by suitably utilizing part of the LILO of Kolar-Sriperumbudur line at Melakottaiyur. Kolar Sriperumbudur 400 kV shall be restored as direct lines.
- b) Establishment of Tiruvelam 765/400kV switching station initially charged at 400kV
- c) Tiruvalam (POWERGRID) – Chitoor 400kV D/C quad line
Standing Committee Approval on : 28th Meeting on 15.06.09
Feasibility Report Submitted on : Aug,09
Investment Approval on : Feb, 10
Commissoning Schedule : Nov 12
Status / Other Remarks :
-Award to be placed shortly.
Related posts:
- Simhadri-II Transmission System – Status Update
- Kaiga U-3&4 Transmission System – Status Update
- Transmission system associated with Chennai NTPC-TNEB JV TPS- Status Update
- System Strengthening XII- Status Update
- Kalpakkam PFBR Transmission System – Status Update
- Transmission System associated with Tuticorin JV – Status Update
- Kudankulam Transmission System – Status Update
- System Strengthening VII – Status Update