ABG Cement – Greenfield Project – Pre-Feasibility Report
M/s ABG Cement Ltd., A Division of ABG Shipyard Ltd., intends to set-up Clinker Grinding Unit of 6.0 MTPA at Surat in the 1st Phase and a 2X30 MW
Pet coke based Captive Thermal Power Plant with CFBC Boiler and Air cooled Condensers in the 2nd Phase. The present Pre-Feasibility report is based on the availability of 1.5 MTPA slag from M/s. Essar, Hazira, sufficient quantities of Fly Ash from Wanakbori and Ukai Thermal Power Plants of GEPCL and easy access to Indian and Overseas market by
economical sea route.
Download ABG Cement – Pre-Feasibility Report
Related posts:
- Naba Hydro Electric Project – Pre Feasibility Report
- Dhopawe Coal Based TPP – Techno-Economic Feasibility Report
- Pre Feasibility Report on Gas Based Power Plants in Karnataka – Download
- Pre-Feasibility Report on Study For Gas Based Power Project in Karnataka
- Revati Cements – Integrated Cement Project – EIA Executive Summary
- Maihar Cement Captive Power Plant – EIA Executive Summary
- Detailed project report for Solar Power Project in Rajasthan
- Suryadev Alloys and Power – Project Report