Status of Solar Power Projects in Gujarat

Given below is the list of ongoing solar power projects ( 10 MW and above) in Gujarat ( Solar Thermal and Solar Photo voltaic)

1. Moser Baer – Solar PV Project

  • Memorandum of Understanding signed with the Government of Gujarat for 600 MWp projects on 12th January, 2009
  • Project allocation of 3 x 15 MWp capacity has been received on August 1, 2009 by Government of Gujarat under Phase-I
  • Technology : Thin Film
  • EPC Contractor : In house.
  • Power Purchase Agreement : PPA has been executed . Under state policy, tariff of Rs.15/unit for first 12 years and thereafter Rs.5/unit from 13th year to 25th year has been approved
  • Transmission & Evacuation : GETCO to provide necessary infrastructure for evacuation of power from project site

Contact :
Moser Baer Solar Limited.
66B, SEZ Udyog Vihar,
Greater Noida (U.P.), India
Tel.: +91-120- 4658000

2. Adani Power – 40 MW solar PV power plant

  • Location : Surendranagar district
  • PPA Signed
  • EPC Contractor : Aries Waaree Solar, a joint venture between Aries Ingenieria y Sistemas, Spain and Waaree Group.
  • Tendering process for photo-voltaic technology-based equipment is underway
  • Project to be operational in end 2011.

Contact :
Adani Power Limited
Shikhar,
Nr. Mithakhali Circle,
Navrangpura,
Ahmedabad-380 009
Phone :+ 91-79-25557134
Fax :+ 91-79-25557177
Email : info@adanipower.com

3. PLG Power – 40 MW Grid Connected Solar PV Power Project.

  • Long Term PPA with Gujarat Urja Vikas Nigam signed.
  • Project Cost : Rs.8800 million
  • EPC Contractor : In house
  • The first 10 MW unit of the solar power project is scheduled to be commissioned by December 2010 and the entire project is expected to be commissioned in a phased manner, by December 2011

Contact :
PLG Power Ltd
139, A-1 Shah & Nahar Ind. Est,
Lower Parel (W), Mumbai- 400013 (India)
Tel: +91-22-42309500
FAX: +91-22-022-42309505

4. Lanco Solar – 35 MW Solar Power Project

  • PPA signed with Gujarat Urja Vikas Nigam
  • Current Status Not known

Contact :
Lanco Solar
Plot No 397 Udyog Vihar
Phase III Gurgaon 122016
Haryana, India
Tel : + 91-124 – 4741000 – 044

5. Cargo Power and Infrastructure Limited (a unit of Cargo Motors) – 25 MW Solar Thermal Power Project

  • Location : Rapar in Kutch district.
  • Letter of Intent received in August 2009.
  • PPA Signed with Gujarat Urja Vikas Nigam
  • Investment : Rs.650-700 crore.
  • The company has reportedly acquired 550 acres of land.
  • Financial Closure is expected in December 2010.
  • EPC Contractor : A Spanish and an Israeli firm will provide technology support and execution.
  • The project is also eligible for carbon credits, or CERs, for 10 years. The 25 MW Solar plant will generate CERs worth Rs3-3.5 crore annually. CERs will be shared between the company and the state government as per the agreed formula.
  • The plant is to be commissioned in end 2011.

Contact :
Cargo Power & Infrastructure (a Cargo Motors Enterprise)
Cargo House, Opp. Gandhi Ashram,
Ashram Road, Ahmedabad-380027
Gujarat, India
Website: http://www.cpil.co.in

6. AES Solar Energy – 15 MW Solar Power Project.

  • PPA Signed with Gujarat Urja Vikas Nigam

Contact :

AES Solar Energy Pvt. Ltd
9th Floor
Bldg 10, Tower B
DLF Cybercity
Gurgaon 122002
Haryana, India
+91 124 4300 300 tel
+91 124 4300 299 fax

7. Solar Semiconductor India – 20 MW Solar PV Power Project

  • PPA Signed with Gujarat Urja Vikas Nigam

Contact :
Solar Semiconductor India
Corporate Office and Manufacturing Facility
FAB City, Survey #114/P,
Srinagar Village, Maheshwaram Mandal,
RR Dist 501359, Andhra Pradesh
Phone: +91 40 67303000
Fax: +91 40 67303003

8. ACME Telepower – 15MW Grid Connected Solar PV Power Project.

  • ACME is setting up a 15 MW Grid Connected Solar PV Power Project using Crystalline/ thin film Solar PV modules.
  • Bids invited in July 2010 for supply of Transformers for 15MWp grid connected Solar Photovoltaic power project in the state of Gujarat.
  • PPA Signed with Gujarat Urja Vikas Nigam

Contact :
Acme Tele Power,
Plot 2, Sector 34,
Gurgaon
Email: manish.jha@acme.in

9. Azure Power – 15MW solar photovoltaic power plant

  • Investment : Rs.184 crore
  • PPA Signed with Gujarat Urja Vikas Nigam
  • The project will be jointly developed with SunEdison, North America
  • Power generation will begin by Jan 2011 with final completion expected by Nov 2011.
  • Once operational, this is expected to be the largest Solar photovoltaic power plant in India.
  • The investment is being led by Overseas Private Investment Corporation (OPIC), a U.S. Government agency. Additional investors include IFC, World Bank group and India and Foundation Capital.

Contact :
Azure Power
8, Local Shopping Complex, Madangir
Ground Floor, Pushp Vihar,
New Delhi  110062
Phone – +91. 11. 49409800
Fax – +91 11. 49409807

10. SunBorne Energy – 15 MW Photo Voltaic (PV) project

  • Project Location : Kutch district.
  • PPA Signed with Gujarat Urja Vikas Nigam
  • EPC Contractor : Inhouse
  • In October 2010, IFC made an investment of US$ 10 Million ($4.1 Mn in equity and $5.9 Mn in quasi-equity instruments) in the company.

Contact :
Mr. Anil Nayar
Sunborne Energy
1st Floor, Technopolis, DLF Golf Club Road,
Sector 54, Gurgaon 122 002, Haryana India
Ph: +91 124 4750600
Fax: +91 124 4750601

http://sunborneenergy.com

11. Welspun Urja India – 15 MW Solar Power Project

  • PPA Signed with Gujarat Urja Vikas Nigam

Contact :
Welspun Urja India
Trade World, ‘B’-wing, 9th Floor,
Kamala Mills Compound,
Senapati Bapat Marg, Lower Parel,
Mumbai 400 013, INDIA

Tel :+91 22 66136000 / 24908000
Fax :+91 22 24908020 / 24908021

12. Astonfield Solar – 10 MW Solar Power Project

  • PPA Signed with Gujarat Urja Vikas Nigam

Contact :
Astonfield Solar Pvt Ltd
Mumbai Office
Maker Chambers V, Suite 916
Nariman Point
Mumbai 400 021, India
Tel: +91 22 6146 4000
Fax: +91 22 2202 9191

13. Millenium Synergy – 10 MW Solar Power Project

  • Project Location : Ahmedabad
  • Project Cost : Rs.200 crore
  • Project will be spread over 40 to 45 acres and will be undertaken in phases.

Contact :
Millenium Synergy Pvt. Ltd.
No 16, 3rd Main Road, Sakamma Garden,
Behind Old Shanti theatre, Basavanagudi,
Bangalore – 560 004, INDIA.
Phone : +91-80-2654 3777 / 3290 0854
Fax : +91-80-2664 6944

Email : info@milleniumsynergy.com

14. SunKon Energy – 10 MW Solar PV Power Plant

  • Project Location : Surendranagar district of North-West Gujarat
  • 25 year PPA (Power Purchase Agreement) with Gujarat Urja Vikas Nigam
  • Project is in the advanced stage of starting construction of this solar power plant.
  • Plant to be commissioned by March 2011.
  • The state transmission utility in Gujarat, GETCO will create the required infrastructure for the plant and all the necessary clearances have been received.

Contact :
SunKon Energy
Corporate Office
A-401, Oberoi Chambers
New Link Road, Andheri (W)
Mumbai 400 053, India
T : +91-22-26744375 / 6
F : +91-22-26744377
E : info@sunkon.co.in

15. Waaree Energies – 10 MW Solar Power Project

  • PPA Signed with Gujarat Urja Vikas Nigam
  • EPC Contractor : Inhouse

Contact :
Waaree Energies Pvt. Ltd.
36, Damji Shamji Industrial Complex,
off. Mahakali Caves road,
Andheri (East), Mumbai-400093,
India
Tel : +91-22-66963030/26874778
Fax : +91-22-26873613
Email : infosolar@waaree.com

http://www.waareeenergies.com

16. ZEBASOLAR – 10 MW Solar PV Power Plant

  • The project involves an investment of 35 million euro
  • This plant will have an annual power production of 16.37 million kWh, and a franchised operation term of 25 years.
  • PPA Signed with Gujarat Urja Vikas Nigam
  • All PV systems will be PV tracker panels, installed on land. ZEBASOLAR is in the process of setting up the GUJARAT joint venture company and confirming the EPC contract.

Contact :
Zeba Solar Pvt Ltd
Administrative HQ
79 Jolly Maker Chambers II
7th Floor
Nariman Point, Mumbai 40002
Office +91-22.66325007
Fax +91-22.66325222
email info@zebasolar.com

3 Comments

  1. Martin

    Enough power to shake a stick at. Let’s hope it starts to make a difference.

    Reply
  2. Chirag

    This is one of the most prestigious and promising move towards green power which indeed should be capitalized as max as possible.CAPEX of such CSP/PV plants however could be a roadblock but lets all vendors put their fair effort to try and leverage it as low as possible.

    Reply
  3. satish vadher

    66kv Power Station Near Land available 200 Acers, 300 Acers, 400 Acers, 500 Acers, 600 Acers, 700 Acers & more…Land Available. Please Call me immediately.

    Reply

Leave a Comment

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>